Burnham Associates, Inc.  -  Dredging, Towing, & Marine Contractors
978.745.1788   /   info@burnhammarine.com   /   CONTACT
  • About
  • Contracting
  • Towing
  • Rentals
  • Projects
  • Equipment
  • Gallery
  • News
  • Employment
Hubline Seabed Restoration

Hubline Seabed Restoration

Client: Duke Energy

Project: Hubline Seabed Restoration Beverly, MA

Value: $3,400,000

Date: Nov. 2003- Feb. 2004

Contact: David Neal

The Duke Energy Seabed Restoration job was an extremely technical project in which stone was required to be placed on a newly laid pipeline on the seafloor.  Exact placement of the stone was essential, which the previous contractor was not able to provide.  The 600 c.y. dump scows were equipped with WINOPS GPS software and two forms of propulsion on the bow and stern of the vessels. These modifications allowed for complete maneuverability and the ability to place the stone exactly where requested.  The project was a huge success benefiting the both the owner and contractor.  The above image shows the pipeline accurately covered by stone.

September 4, 2014 admin
← Portsmouth Coast Guard Station
York Harbor Dredging →

PAST PROJECTS

  • Boston Rock Project
    Boston Rock Project
  • Cape Ann Marina
    Cape Ann Marina
  • South River Dredging, Scituate, MA
    South River Dredging, Scituate, MA
  • New Bedford CAD 2
    New Bedford CAD 2
  • Hodgkins Cove, Gloucester, MA
    Hodgkins Cove, Gloucester, MA
  • Cheesequake Creek Maintenance Dredging, South Amboy, NJ
    Cheesequake Creek Maintenance Dredging, South Amboy, NJ
  • Jonesport, ME Dredge Job
    Jonesport, ME Dredge Job
  • Portsmouth Coast Guard Station
    Portsmouth Coast Guard Station
  • Port Norfolk Yacht Club
    Port Norfolk Yacht Club
  • Hubline Seabed Restoration
    Hubline Seabed Restoration
  • Private Pier Construction
    Private Pier Construction
  • York Harbor Dredging
    York Harbor Dredging
  • Pawtuxet Cove, RI
    Pawtuxet Cove, RI
  • Wellfleet Harbor
    Wellfleet Harbor
  • Hingham Harbor Dredging
    Hingham Harbor Dredging
View All Projects >>

Contact Us

978.745.1788

info*burnhammarine.com

14 Franklin St.

Salem, MA 01970

News

  • First Phase of Plymouth Dredging Wraps Up
  • Cape Cod and Beyond
  • Burnham Associates Inc Secures Work With Steamship Authority
Copyright © 2014 Burnham Associates, Inc. All Rights Reserved