Wellfleet Harbor
Client: MASS D.E.M.
Project: Wellfleet Harbor, MA Dredge Project
Value: $1,100,000
Date: Dec. 2000 – Dec. 2001
Contact: Bill Cavanaugh MASS D.E.M.
Wellfleet Harbor consisted of the removal of 103,000 cubic yard of mud. The dredge SAMSON III and Bucyrus Erie 88-B crawler crane dredged the material with the newly purchased 1,500 c.y. dump scow MUDCAT. The material was transferred to the Cape Cod Dump Site for disposal.